We produced a steel structure of compact wall parts for covering a GE gas turbine. The walls are prepared in the manufacturing process, including insulation, and only a simple assembly of large-scale segments follows on site. TMETAL did not want to stand aside to this possible future production trend, even though it demands lots of space, difficult manipulation and complicated logistics. The test pre-assembly and overseas packaging was part of our supply.

Photos from the pre-assembly of a structure designed to soundproof the gas turbine – wall panels with insulation for two units. The structures are 10 m resp. 8 m high.

Total delivery weight 240 t.

Date: May 2021
Category: Structures in power generation
Destination country: Algeria

What they say about us

“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “

Adolf Dolák, Windmöller & Hölscher Prostějov k.s.